A supervisor who _____ can cause rework, an increase in costs, and may delay the progress of the project.
a. decides a crew needs training before the start of a job
b. assumes a job can be performed exactly like another job
c. believes morale should be measured occasionally
d. develops a standard for implementing performance reviews
b. assumes a job can be performed exactly like another job
You might also like to view...
Describe the first two steps in the generic schedule of required activities that might be followed when qualifying and certifying the welding process, the welder(s), and/or welding operator.
What will be an ideal response?
In the past, meat was preserved by using which of the following methods?
a. Drying c. Curing b. Canning d. All answers
Hard code failures are those that were detected the last time the BCM tested the circuit.
Answer the following statement true (T) or false (F)
A periodic rectangular pulse train shown in Figure 1 has amplitude A = 1 V, period T0 = 1 1 s, and pulse width ? = 0.15s. This signal is applied to a circuit shown in Figure 2. R = 1?, L = 0.1H. H(?) = Y(?)/F(?). ?0 = 2?/T0.
(a) Find the numerical values of cn and ?n of f(t) for n = 1.
(b) Find the numerical values of |H(jn?0)| and ?H(jn?0) for n = 1. (c) Find the numerical values of ycn and y?n of y(t) for n = 1.