A statement of a schedule of requirements for individual end items is called:

A) a production plan.
B) a capacity plan.
C) a master production schedule.
D) a material requirements plan.
E) none of the above


C

Trades & Technology

You might also like to view...

What would the shaft and hole size be for a Ø.50 nominal size using an RC4 fit?

a. shaft ø.4870/.4094, hole ø.5000/.5100 b. shaft ø.4987/.4994, hole ø.5000/.50001 c. shaft ø.4987/.4994, hole ø.5000/.5100 d. shaft ø.4987/.4994, hole ø.5000/.5010

Trades & Technology

What effect do you think cultivation could have on soil pH? (Hint: Think about

the amount of organic material and chemicals added to the soil during farming.)

What will be an ideal response?

Trades & Technology

What is the large cage-like structure erected for the purpose of drilling for oil on land?

What will be an ideal response?

Trades & Technology

In 2016, Google rented 1000 acres of a historic California airbase in the San Francisco Bay Area for $1.16 billion via a 60-year lease. Annual M&O is expected to be $6.3 million. In addition, Google will refurbish three hangars at a cost of $2.6 mil­lion 4 years from now. Assuming the $1.16 billion represents the present worth of only the lease, what is the equivalent AW of the transaction over the 60-year period at an interest rate of 15% per year?

What will be an ideal response?

Trades & Technology