Information that cannot be provided clearly or completely on the drawing or in schedules is provided in construction:
A. drawings
B. specifications
C. notes
D. all of the above
Answer: C
You might also like to view...
What is a ribbed concrete slab-on-ground?
What will be an ideal response?
In the following list of retail cuts of meat, identify the cut as beef, pork, or lamb
a. beef c. lamb b. pork 21. cubed steak 22. spareribs 23. French rib chops 24. double loin chop 25. corned brisket 26. crown roast 27. flank steak 28. ham
?What may happen if too short of an arc length is used?
A. ?The spatter may increase as the weld increases in size. B. ?The arc voltage will increase and the arc will become brighter. C. ?The electrode may stick to the plate. D. ?The amperage will increase and the weld fumes will increase.
Because of the nonflexible sidewalls, bias ply tires give the best braking performance.
Answer the following statement true (T) or false (F)