In material requirements planning, the process of placing the exploded requirements in the proper time periods, based on the assembly lead times involved, is known as:

A) netting.
B) offsetting.
C) scheduling.
D) all of the above
E) none of the above


B

Trades & Technology

You might also like to view...

How do you differentiate between different types of handoff? Explain.

What will be an ideal response?

Trades & Technology

What are the two components of the cost of a transportation facility improvement? Describe each.

What will be an ideal response?

Trades & Technology

Pneumatic controls are operated using ____.

A. air pressure B. oil pressure C. steam pressure D. water pressure

Trades & Technology

If the refrigerant is recovered improperly from a water-cooled condenser:

A) All the water may drain out of the condenser. B) The oil dissolved in the refrigerant may crystalize. C) The water may boil. D) The water may freeze.

Trades & Technology