Linnear Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for the current year on the following data: ?Total machine-hours30,000?Total fixed manufacturing overhead cost$144,000?Variable manufacturing overhead per machine-hour$4.00Required:Calculate the estimated total manufacturing overhead for the year.
What will be an ideal response?
Estimated total manufacturing overhead cost = Estimated total fixed manufacturing overhead cost + (Estimated variable overhead cost per unit of the allocation base × Estimated total amount of the allocation base) = $144,000 + ($4.00 per machine-hour × 30,000 machine-hours) = $144,000 + $120,000 = $264,000
You might also like to view...
Which group tends to do little disclosing about themselves to others except those few people they are very close to?
A. Asian B. United States C. Japanese D. Korean E. Arabic
Which of the following behaviors is not associated with the opportunistic leadership style?
A. The leader shifts his or her style to gain personal advantage. B. The leader may be perceived as ruthless and cunning. C. The leader may be perceived as adaptable and strategic. D. The leader stresses the importance of social needs.
A(n) ____is a request a programmer includes within his or her code that asks Oracle to modify the default processing in some manner.
A. compiler hint B. pass by value C. pass by reference D. purity level
A speaker who creates an ______ charged event captures our interest.
Fill in the blank(s) with the appropriate word(s).