In a traditional carpentry apprenticeship program, the total number of OJL hours required is _____
a. 500
b. 2,000
c. 4,000
d. 8,000
d
Trades & Technology
You might also like to view...
The building code has an influence over every aspect of a construction project.
Answer the following statement true (T) or false (F)
Trades & Technology
List five symptoms of AIDS
What will be an ideal response?
Trades & Technology
Bimetal and solder pot overload devices are thermally operated.
Answer the following statement true (T) or false (F)
Trades & Technology
Normally, a single part in an assembly is drawn alone on one sheet without any portion of the assembly shown. In some applications, it is necessary to show a part or parts that are next to the part being detailed. This is the related part method. Describe the related part method.
What will be an ideal response?
Trades & Technology