On-site changes in the original design that are made during construction are documented in the _____.

a. as-built drawings
b. takeoff sheet
c. project schedule
d. job specifications


a. as-built drawings

Trades & Technology

You might also like to view...

In the CMAR method of project delivery, the CM

A) advises the owner in the selection of the architect and the design team members. B) advises the design team with respect to the constructability of design decisions and their cost implications. C) works as the general contractor for the project. D) only A and B E) only B and C

Trades & Technology

Cartridge fuses used for branch circuit protection must be marked with the ampere rating, voltage rating, and the _____.

a. date manufactured b. dimensions c. expiration d. interrupting rating

Trades & Technology

According to the text, it is important to be timely with what?

A) Criticism B) Praise C) Both A and B D) Neither A nor B

Trades & Technology

Utility rooms are often placed near either the bedrooms or the kitchen area.

Answer the following statement true (T) or false (F)

Trades & Technology