When using a time study approach, the standard time is the:
A) normal time per cycle multiplied by 1.0 plus the allowance.
B) select time multiplied by the rating factor, summed over all work elements.
C) select time plus z times the standard deviation.
D) normal time plus z times the standard deviation.
A
You might also like to view...
Which of the following would be the most appropriate approach when planning a proposal?
A) The direct approach B) The cause and effect approach C) The indirect approach D) The formal/objective approach E) The persuasive approach
The two costs of compliance are ______________________________ and ______________________________
Fill in the blank(s) with correct word
In the context of the classical approaches to management, the systematic management approach led to widespread production efficiency.
Answer the following statement true (T) or false (F)
Refer to Table 4-2. The Total Asset Turnover ratio for 2007 was approximately
A) 1.54. B) 1.49. C) 1.44. D) 1.47.