Specifications do all of the following except _____
a. clarify information that cannot be shown on the drawings
b. define materials to be used
c. serve as a guide for compliance with building codes
d. replace the drawing notes
d
You might also like to view...
In the formula for throughput efficiency, VA stands for:
A. Value-adding time B. Valuation aim C. Visual aid D. Vector analysis
There is a high risk of cost overruns with material estimates. ?
Answer the following statement true (T) or false (F)
____ is an evaluation technique that requires analyzing benefits and risks, understanding the trade-offs, and then determining the best action to take to ensure that the desired positive outcomes outweigh any negative outcomes.
A. Assessment B. Iteration C. Order D. Brainstorming
Overload is defined as operation of equipment in excess of normal, full-load rating, or of a conductor ____ that, when it persists for a sufficient length of time, would cause damage or dangerous overheating.
A. at 75% or of rated ampacity B. in excess of rated ampacity C. at 90% of rated ampacity D. in excess calculated peak voltage