How do you verify the correctness of a project in the RSLogix software?
What will be an ideal response?
To verify the correctness of the project, click on the Verify Project button at the top of the program area.
You might also like to view...
If personnel are to be hoisted, a qualified person must evaluate the situation and determine if it the lift is still safe once the wind speed reaches _____.
a. 5 mph (8.1 kph) b. 20 mph (32.2 kph) c. 30 mph (48.3 kph) d. 35 mph (56.3 kph)
You are replacing a spring brake chamber on a truck drive axle with a one with a pushrod that must be cut to size. Which of the following MUST be performed to properly fit the new spring brake chamber?
A. replace the pushrod clevis yoke B. replace the slack adjuster C. cut the pushrod to size to ensure 90-degree fully-applied slack adjuster angle D. cut the spring brake bracket to ensure 90-degree pushrod to slack adjuster angle
The charge entering a certain element is shown in Fig. 1.23. Find the current at: (a) t = 1 ms (b) t = 6 ms (c) t = 10 ms
What should be done to a bypass, luberfiner filter after changing the engine oil?
A. clean with solvent B. clean with pressure washer C. purge air on start-up D. prime with used oil