Create an ER diagram based on the following requirements:The database will keep track of students and colleges.- For each student, we will keep track of his or her name and unique student ID
- For each college, we will keep track of its unique name and its location.- Each student in the database attends exactly one college.- Each college in the database has multiple students.- For each student, we keep track of the date he or she started attending his or her college.
Diagram in the bottom part of Figure 2.12
You might also like to view...
Which of the following is a cost that cannot be reasonably quantified?
a. nonrecurring cost b. recurring cost c. tangible cost d. intangible cost
Which of the following is NOT a reason for network jitter when using packet
switching networks? A. packets may vary in length B. packets may take different paths through the network C. packets may encounter network congestion D. data rates will vary from one trunk line to the next
If a negotiable instrument is transferred by negotiation, the transferee takes the instrument:
a. with all of the transferor's rights and responsibilities b. with all of transferor's responsibilities, but none of the rights c. with the duties that have been assigned to the instrument by the bearer d. with the rights that have been assigned to the instrument by the holder in due course e. none of the other choices
Gerstein Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on direct labor-hours. The company based its predetermined overhead rate for the current year on total fixed manufacturing overhead cost of $90,000, variable manufacturing overhead of $3.70 per direct labor-hour, and 50,000 direct labor-hours. The company recently completed Job M800 which required 150 direct labor-hours.The estimated total manufacturing overhead is closest to:
A. $275,000 B. $185,000 C. $90,004 D. $90,000