________ is the process by which concrete solidifies and hardens

A) Hydration B) Curing C) Dehydration D) Compressing


B

Trades & Technology

You might also like to view...

What is the advantage of a PCV valve over a road draft tube?

What will be an ideal response?

Trades & Technology

Electrical drawings are typically drawn with all components energized.

Answer the following statement true (T) or false (F)

Trades & Technology

Except for federal contracts, if a change is required in the Contract Documents after signing a contract for construction, the type of document used to implement that change is called:

A. a change order B. a field order C. an addendum D. a shop drawing E. a Notice to Proceed

Trades & Technology

The dimensions of a door marked 3668 on a floor plan are _____

a. 36? wide, 68? high b. 36? wide, 6?-8? high c. 3?-6? wide, 6?-8? high d. 36? wide, 6?-8? high