In the accompanying figure, the second circuiting symbol from the top stands for ____.

A. wiring concealed in floor
B. wiring exposed
C. wiring turned down
D. wiring concealed in ceiling or wall


Answer: A

Trades & Technology

You might also like to view...

A(n) _________ would be one in which the insulation is placed against the roof instead of the floor.

A. separate space B. attic C. conditioned attic D. basement

Trades & Technology

Employees are more likely to be committed to the work that they do if _______

A) Are afraid of loosing their job B) They are assigned meaningless tasks C) They are working to their strengths D) None of the above

Trades & Technology

What happens to the volume of a marshmallow when squeeze it?

a. Increases b. Decreases c. Remains constant

Trades & Technology

In most cases, ceiling joists meet over load-bearing interior walls because of span requirements in the IRC. Using the most common layout method, ceiling joists lap over the bearing partition. The two sidewall layouts for ceiling joists are staggered ________ inches so they meet side-by-side over the support

A) 1 1/2" B) 3/4" C) 3" D) 4 1/2"

Trades & Technology