10 is 50% of ____________________.

Fill in the blank(s) with the appropriate word(s).


20

Trades & Technology

You might also like to view...

Answer the following statements true (T) or false (F)

1. Establishing the project's economic feasibility and its overall budget is part of the design phase of the project. 2. The construction drawings of a building project are drawings that the architect uses to explain the design to the owner. 3. The project manual includes the project's construction drawings. 4. All required surety bonds must be provided by the GCs who are bidding for the project, along with their bids, that is, at the time of bidding. 5. Where the owner is sufficiently familiar and confident of the financial and contractual capabilities of the GCs bidding for the project, the owner may not require the bid bond. This reduces the total cost of construction.

Trades & Technology

Read the voltmeter in the accompanying figure to the nearest tenth of a volt. The switch is set to 24.

A. 27.0 B. 27.6 C. 28.2 D. 28.8

Trades & Technology

An assembly job takes 15 minutes. How many jobs is a worker expected to do in an 8-hour day?

A. 20 B. 28 C. 32 D. 36

Trades & Technology

State 0.740 kilowatts-hour as kilojoules.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology