________ is responsible for determining the capacity required and methods of making the capacity available
A) Master production scheduling
B) Production activity control
C) Capacity planning
D) Material requirements planning
E) Production planning
C
You might also like to view...
Si un cable se clasifica como 6 x 19 Seale IWRC, el 6 representa _____.
a. la cantidad de alambres en cada torón b. la cantidad de torones en un cable c. el diámetro del cable d. el grado de acero utilizado
When processing the signal from an inductive pulse generator used to measure shaft rotational speed, which of the following is used to process the signal to an rpm value?
A. DC voltage B. AC voltage C. Amperage D. Frequency
What international event contributed to a flowering of English nationalist spirit?
A. the defeat of the Spanish Armada B. the seven years’ war C. the discovery of North America D. the creation of the Dutch East-Indies Company E. the settling of Jamestown
Spraying nail antiseptic on nails, removes:
What will be an ideal response?