Describe methods for preventing disruption to an environmentally sensitive area.
What will be an ideal response?
avoid the area, redirect traffic and siltation to other areas, prepare a special transportation and work corridor through the area.
You might also like to view...
Los Ășltimos pasos del ensamblaje de la pluma son _____.
a. anclar el bloque, levantar la pluma y aparejar el cable para levantar carga b. mover los colgantes hasta el extremo de la pluma, anclar el bloque y levantar la pluma c. anclar el bloque, mover los colgantes hasta el extremo de la pluma y levantar la pluma d. aparejar el cable para levantar carga, mover los colgantes hasta el extremo de la pluma y levantar la pluma
Your cotton picker broke down and was in the shop 5.5 days. The mechanics worked 24.6 hours at $76 per hour to repair the picker. The parts cost $2,318.04. You lost $21 per hour for not having the use of the picker. You work 12-hour days. What did the breakdown cost?
What will be an ideal response?
Anti-rattle spring clips ________
A) Allow the pads to move around B) Damp vibrations C) Help quiet drum brake noise D) Are used as an option for disc brake systems
Even if you are drawing plans for a construction site where seismic risk is high, you can alter window placement depending on whether an engineer supervises the design or the design follows the prescriptive path of the IRC.
Answer the following statement true (T) or false (F)