List four elements of the air-conditioning system that the total system control module must supervise.

What will be an ideal response?


The total system control module must supervise the operation of the following elements of the air-conditioning system:• Control the capacity of the compressor• Control the speed of the indoor fan motor• Control the speed of the outdoor fan motor• Control the temperature of the structure• Control the humidity of the structure• Maintain the air quality of the structure• Maintain adequate ventilation

Trades & Technology

You might also like to view...

When the SCR is connected in an AC circuit, the output is ____________________ current.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

Describe a root weld.

What will be an ideal response?

Trades & Technology

The basic approach to testing D/A converters is to ________

A) apply a sequence of binary codes covering the full range of the input to the input while observing the output on an oscilloscope. The output should consist of a linear stairstep ramp B) single-step the device through its full input range while checking the output with a DMM C) apply the correct input to the analog terminal and then check to see if the proper binary code exists on the digital inputs D) check the output with zero input and then full input. The output of the converter should extend from zero to its maximum value. If so, then everything in between can be assumed to be operating properly

Trades & Technology

Which of the following is NOT a step in establishing a business?

A. Developing a business plan B. Getting a truck or other vehicle C. Getting a business license D. Obtaining insurance

Trades & Technology