Once building lines are established on the batter boards, each string is held in alignment by using a _____.
a. nail
b. clamp
c. saw kerf
d. staple
Answer: C
You might also like to view...
When using the fire blanket, make sure the person is standing when wrapping the blanket
Indicate whether the statement is true or false
An installer can work 6 1/2 hours each day at a worksite. The installer will need 42 1/4 hours to do a complete installation of a heating and cooling system. How many days will the installer be at the job site?
Fill in the blank(s) with the appropriate word(s).
Two types of oblique projections are:
A. cavalier and converging B. cabinet and half-scale C. cabinet and cavalier D. full-scale and cavalier
The voltage waveform shown in Figure P4.10 is piecewise linear and continuous. Assume the voltage is across a 100-?F capacitor. Determine the current iC (t) through the capacitor. Explain the concept of current through a capacitor even when the space between the capacitor plates is a perfect insulator. How is current through a capacitor different from leakage current?