Lotus Development has a software rental plan called SmartSuite that is available on the World Wide Web. A number of programs are available at $2.99 for 48 hours. If a construction company uses the service every week for an average of 48 hours, what is the future worth of the rental costs for 1 year at an interest rate of 1% per month, comĀpounded weekly? (Assume 4 weeks per month.)
What will be an ideal response?
i/week = 0.25%
F = 2.99(F/A,0.25%,52)
= 2.99(55.4575)
= $165.82
You might also like to view...
A traffic signal control is being designed for a four-leg intersection on a divided highway with the characteristics shown in the table below. Determine an appropriate length of the yellow interval for each approach and how you will provide it.
An astable 555 timer is designed using the following external components: RA = 8.5 k?, RB = 470 ?, C = 2.2 ?F. Calculate time LOW (tLO)
A) 0.325 msec B) 0.75 ?sec C) 716 ?sec D) 455 ?sec
Elevations are usually laid out in the true orthographic projection of front, side, rear, side.
Answer the following statement true (T) or false (F)
Which of the following features would be required in an aluminum alloy, trunk type piston when used in a diesel engine application?
A. full floating wrist pin B. ring groove insert (Ni-Resist) C. chromed pin boss D. tin plating