Lotus Development has a software rental plan called SmartSuite that is available on the World Wide Web. A number of programs are available at $2.99 for 48 hours. If a construction company uses the service every week for an average of 48 hours, what is the future worth of the rental costs for 1 year at an interest rate of 1% per month, comĀ­pounded weekly? (Assume 4 weeks per month.)

What will be an ideal response?


i/week = 0.25%

F = 2.99(F/A,0.25%,52)
= 2.99(55.4575)
= $165.82

Trades & Technology

You might also like to view...

A traffic signal control is being designed for a four-leg intersection on a divided highway with the characteristics shown in the table below. Determine an appropriate length of the yellow interval for each approach and how you will provide it.



Trades & Technology

An astable 555 timer is designed using the following external components: RA = 8.5 k?, RB = 470 ?, C = 2.2 ?F. Calculate time LOW (tLO)

A) 0.325 msec B) 0.75 ?sec C) 716 ?sec D) 455 ?sec

Trades & Technology

Elevations are usually laid out in the true orthographic projection of front, side, rear, side.

Answer the following statement true (T) or false (F)

Trades & Technology

Which of the following features would be required in an aluminum alloy, trunk type piston when used in a diesel engine application?

A. full floating wrist pin B. ring groove insert (Ni-Resist) C. chromed pin boss D. tin plating

Trades & Technology