Mixed format:
(with a space between the whole number and the numerator)Fraction format:
Reduce all fractions. In estimating a job, it is decided that it should take 13 people
hours each to do part of the work, and 7 people
hours each to do the remainder of the job.
Determine the total number of hours estimated for the job.
Fill in the blank(s) with the appropriate word(s).
92
You might also like to view...
The unit scfm is a measure of air volume under conditions that are _____.
a. typical b. ideal c. standard d. actual
What are the steps involved in installing connecting rod bearings?
What will be an ideal response?
Technician A says during the operation of the stator, only a portion of the fluid returning from the turbine to the impeller passes through the stator. Technician B says when the stator is in operation, it redirects the fluid leaving the turbine back to the impeller. Who is correct?
A. A only B. B only C. Both A and B D. Neither A nor B
All of these are types of injector circuits EXCEPT ________
A) Peak and hold B) Pulse width modulated C) Saturated switch D) All of these are types of injector circuits.