Improper system sizing, airflow and charging result in a significant reduction in capacity that can be as great as __________.

A. 10%
B. 20%
C. 40%
D. 50%


Answer: B

Trades & Technology

You might also like to view...

¿Cuántas secciones de tres pies (0,91 m) de aislamiento para tuberías se necesitan para aislar 420 pies (128,02 m) de tubería?

a. 100 b. 160 c. 140 d. 420

Trades & Technology

Diversity in the construction industry is increasingly being driven by _____.

a. civil rights b. consumer demands for construction projects c. OSHA requirements d. labor laws

Trades & Technology

One way to at least partially deal with forecasting problems associated with environmental

uncertainty is to

a. develop plans over several time horizons. b. do sales forecasting first, followed by other forecasts. c. develop an absolute forecasting index. d. express forecasts as a range of values. e. All of the above.

Trades & Technology

Technician A says that when it is necessary to rebuild a torque converter stator assembly, it should be removed first. Technician B says that cracked stator vanes can be TIG welded. Who is correct?

A. Technician A B. Technician B C. Both Technician A and B D. Neither Technician A nor B

Trades & Technology