A 60% duty cycle means that the machine can be used a total of ____ minutes out of every ten minutes at the maximum rated current.
A. two
B. six
C. eight
D. ten
Answer: B
Trades & Technology
You might also like to view...
What must a contractor show in order to invoke the defense of commercial impracticability?
What will be an ideal response?
Trades & Technology
What causes the pointer to move on a dial type thermometer?
What will be an ideal response?
Trades & Technology
To avoid falling, when working above a sheetrock ceiling technicians should:
A) Walk quickly whenever it is necessary to walk directly on the sheetrock. B) Walk slowly whenever it is necessary to walk directly on the sheetrock. C) Step only on the sheetrock between the ceiling joists. D) Step only on the ceiling joists.
Trades & Technology
Requirements for waste reduction should be included in the __________________.
Fill in the blank(s) with the appropriate word(s).
Trades & Technology