The required system capacity in tons can be determined by dividing:

A) 200 BTU/min by the system's refrigeration effect.
B) 300 BTU/min by the system's refrigeration effect.
C) 100 BTU/min by the system's refrigeration effect.
D) 600 BTU/min by the system's refrigeration effect.


A

Trades & Technology

You might also like to view...

New clay or shale brickwork should not be washed for _____ after brickwork is completed.

A. two weeks B. at least 7 days C. 72 hours D. 24 hours

Trades & Technology

The diode can be tested with a(n) ____.

a. ammeter b. voltmeter c. ohmmeter d. multimeter

Trades & Technology

A series RLC circuit has the following parameters: R = 1 k?, L = 1 H, and C = 10 nF. What type of damping does this circuit exhibit?

What will be an ideal response?

Trades & Technology

What are the two national organizations that worked together to develop the REGREEN program?

A) American Society of Interior Designers, United States Green Building Council B) American Society of Interior Designers, EarthCraft C) LEED for Homes, United States Green Building Council D) LEED for Homes, EarthCraft

Trades & Technology