If the risks seem ____, the contractor may decide to not bid on a proposed project
a. too great
b. within reason
c. acceptable
d. easily mitigated
a
You might also like to view...
Which of the following is NOT one of the “six C’s” developed for effective managerial writing?
A) Courtesy B) Clearness C) Confidence D) Correctness
Describe a situation you’re familiar with when an organization did not have a good internal “fit” and the consequences of that shortfall.
What will be an ideal response?
Traits such as the ability to work in teams, a positive attitude, and creativity in coming up with new ideas are easy to measure
Indicate whether the statement is true or false
ABC, Inc., is a small clothing manufacturer that produces shirts and pants using two resources: sewing machine hours and cutting machine hours. The production manager can schedule up to 240 hr of sewing machine time and up to 150 hr of cutting machine time. Production of one shirt requires 3 hr of sewing time and 1 hr of cutting time. Each pair of pants requires 2 hr of sewing time and 1.5 hr of cutting time. Each shirt yields a profit of $5, and each pair of pants generates a $6 profit. The objective is to maximize profits. Determine cutting time constraint for the LP formulation. Let X1 = Number of shirts to be produced, X2 = Number of pairs of pants to be produced. Which one of the following is NOT one of the corner points (x1, x2) in this LP formulation?
A. (24,84) B. (80,100) C. (0,100) D. (80,0)