Planning the flow of work requires production activity control to:

I. be sure the material needed is available.
II. be sure the tooling needed is available.
III. schedule the start and stop dates at each work center.
IV. advise the plant supervisor of future orders.

A) I, II, III and IV
B) I, II and IV
C) II, III and IV
D) I, II and III
E) I, III and IV


D

Trades & Technology

You might also like to view...

The ____ approach for detecting intrusions is based on the frequency with which certain network activities take place.

A. signature-based IDPS B. knowledge-based IDPS C. anomaly-based IDPS D. host-based IDPS

Trades & Technology

Which of the following leads to cleanup costs?

A. Overfilling B. Pulling a vacuum on a tank while emptying C. Putting wrong or off-spec material in a vessel D. All of the above

Trades & Technology

Technician Asays a poor ground on one of the headlamps will cause it to be dim. Technician B says AC generator output that is too high can cause headlights to be brighter than normal. Who is correct?

A. Technician A only B. Technician B only C. Both Technician A and B D. Neither Technician A nor B

Trades & Technology

In a two pipe system

A) Each convector is supplied with the same temperature hot water B) All the water flows through each convector in the loop C) The main supply water temperature drops a little through each convector D) The convector can be used for both heating and cooling

Trades & Technology