A VMware vSphere 6.x Administrator has been tasked with enabling the Integrated Load Balancer for the new vRealize Log Insight cluster. What three options are required before the Integrated Load Balancer can be used? (Choose three.)

asked in Computer Science & Information Technology by
A. The time on the vRealize Log Insight virtual appliance must be synchronized with an NTP server.
B. All vRealize Log Insight nodes are configured as the same size.
C. The vRealize Log Insight master and work nodes must have CA signed certificates.
D. Verify that all vRealize Log Insight nodes and the specified Integrated Load Balancer IP address are on the same network.
E. The vRealize Log Insight master and worker nodes must have the same certificates.

0 Answer

0 votes
answered Jun 8, 2022 by JessME1
 
Best answer
Answer:
A. The time on the vRealize Log Insight virtual appliance must be synchronized with an NTP server.
D. Verify that all vRealize Log Insight nodes and the specified Integrated Load Balancer IP address are on the same network.
E. The vRealize Log Insight master and worker nodes must have the same certificates.